product launch

Drayton launches next generation Digistat – With Bluetooth connectivity

Drayton has launched the next generation of its Digistat, with a new look and app control – an industry first for a universal thermostat. Bluetooth connectivity offers in-home control of the new Digistat via Drayton’s Wiser Home app, making it easier than ever for users to create and adjust heating schedules, all from their phone. […]

Read More

Makita launches new 36V LXT Cordless Brushless Pressure Washer

Makita UK has expanded its cordless power tool range with the new 36V LXT Cordless Brushless Pressure Washer. The first of its kind from Makita, the new high Pressure Washer features a 50L storage tank enabling users to tackle dirt and grime anywhere. Featuring a self-priming function to extract water from an external water source […]

Read More

Graham launches brand new transactional website

Graham Plumbers’ Merchant has launched its brand new transactional website, allowing customers to purchase products online either to be delivered or collected in-branch. The website currently lists thousands of products, with new items being added all the time, across more than 100 product ranges. Open to the trade and consumers alike, the new iteration of […]

Read More

Navien launches Navien Choice loyalty scheme

Navien has launched Navien Choice – a new loyalty scheme open to all oil and gas boiler installers. There is a whole catalogue of high quality rewards available, from wireless speakers and pizza ovens, through to PlayStation 5 consoles, iPhones and holiday vouchers – as well as barbeques, perfect for the summer months. Installers can […]

Read More

Domus Ventilation Launches Non-Combustible Solis Air Brick™

Domus Ventilation, part of the Polypipe group, has launched the new Solis Air Brick™ range of low resistance, non-combustible metal air bricks that are fully compliant with the revised Building Regulations Fire Safety Approved Document B. Changes to the Building Regulations, which came into force in November 2020, requires “Ductwork penetrating through the external cavity including termination to be non-combustible” when above 18m in England and 11m in Scotland, although it is expected […]

Read More