Luceco hits the right note for Kidderminster’s regenerated Piano Building

The Piano Building in Kidderminster is a Grade II listed structure that was originally built in 1867 as a wool warehouse. Over time it was used for different purposes, including as an education centre, before becoming empty in 2019. Purchased by Wyre Forest District Council in 2024, the Piano Building project is part of the town’s wider regeneration programme and it has now been repurposed into a modern mixed use facility that includes co-working and hybrid working spaces, entertainment space and restaurants.

West Midlands-based electrical contracting firm, Barrie Beard, was appointed to carry out the electrical installation work and needed to deliver a new, high performance lighting and controls system for the building. After assessing the available options, Luceco was able to provide a complete solution that met the brief.

Prior to the project start Luceco carried out a demonstration to explain the controls offering and outline the potential savings the client could achieve.

It then recommended a carefully selected range of high performance luminaires to meet the various lighting requirements of the Piano Building.

The solution included Luceco’s Climate Extra IP66 linear luminaire, chosen for its durability and exceptional efficiency for areas needing reliable, low maintenance lighting. The company’s Platinum Downlights also provide a crisp, clean light in communal areas and are complemented by Celeste backlit panels, which were selected for their uniform light distribution and contemporary finish. Joining them, Luceco’s Contour linear profiles offer discreet yet effective lighting to transitional spaces.

Presence and daylight sensors were also integrated to allow the system to adapt automatically. This reduces energy use in unoccupied areas and enhances the building’s sustainability credentials.

Luceco’s account manager, Jay Taylor, commented:

“This was about more than installing luminaires. It was about delivering a sustainable, future ready solution that supports both the contractor and the client, reinforcing the value of partnering with a manufacturer that delivers both innovation and support. We’re proud to have contributed to a project that celebrates heritage while creating modern spaces that people want to use.”

National Heat Pump Week runs 12–16 October, with Heat Pump Association UK. Working in installation, manufacturing or distribution? Register your interest and be first to hear when sessions are confirmed.

Register your interest